As Prime Consultant for this 3-phased 50,000-ton Chilled Water Plant, TEI was responsible for the Mechanical, Electrical, Site Civil, Geo-technical, and Structural Engineering Aspects of the plant.

CLIENT
University of Pennsylvania
ARCHITECTS
Leers Weinzapfel
YEAR
2008
PROJECT TYPE
Chilled Water Plant
STATUS
Completed

University of Pennsylvania Mod VII CWP Design & Expansion

The plant supplements the University’s existing integrated systems and replaced antiquated plants. TEI developed the commissioning specification and assisted in all aspects of commissioning. Economic analysis addressed a combination of design, maintenance, construction, and financial criteria to model the plant.

Design and Documentation included:

 

50,000 ton plant capacity
Site utilities (60” piping)
50 megawatt electrical service
Variable flow primary system

Fully automated PLC DOC control system:

 

Integrated operations with existing plants. Capable of “unmanned operation”. Extensive coordination with Design Team. Fast Track Construction